On page 74, it writes: "Unplug the power cord and do not continue with the build until all the B+ terminals have dropped below 50V. This may take several minutes.". To check B+ terminals, the chassis has to be turned downside up which I am not very willing to do. So the "several minutes" here is the same "8+ minutes" in the Power Supply Testing, right ? So one should wait ~10 minutes at least.