A couple quick updates for folks building the Paradynes:
- We're increasing the wire length from OT-6 to 44L to something more like 7-1/4" since it's pretty tight at 7".
- We're making sure the choke number isn't transposed in a couple spots as it is currently.
- The post-tube installation voltage test has terminal 5 reading 530V but it should read 250V.
- A couple solder instructions are missing the bold and underline.