pbvoorhees
New member
Greetings!
I just completed the build of my first kit. I am pretty excited.
The next step is the resistance check.
All of my testing so far (generally) lines up with the numbers in the guide but I want to confirm that I am doing this correctly.
Question 1:The instructions say "Attach the negative lead to the ground buss at terminal H1'. Is the 'ground buss' the ground located directly next to the IEC inlet? Question 2 (And my real question about resistances): Terminal 15 should read 0 but I keep getting a reading of 0.1 for a moment and then it jump to 1.2. I've tested this terminal numerous times and I get this same reading consistently.
The jump to 1.2 is throwing me off and seems like something might be wrong.
Any ideas or suggestions are welcome.
Thanks.
Pieter
I just completed the build of my first kit. I am pretty excited.
The next step is the resistance check.
All of my testing so far (generally) lines up with the numbers in the guide but I want to confirm that I am doing this correctly.
Question 1:The instructions say "Attach the negative lead to the ground buss at terminal H1'. Is the 'ground buss' the ground located directly next to the IEC inlet? Question 2 (And my real question about resistances): Terminal 15 should read 0 but I keep getting a reading of 0.1 for a moment and then it jump to 1.2. I've tested this terminal numerous times and I get this same reading consistently.
The jump to 1.2 is throwing me off and seems like something might be wrong.
Any ideas or suggestions are welcome.
Thanks.
Pieter