Hi,
I Just upgraded the parafeed copling cap and replaced my old Sovtek 2A3 by Shuguang 2A3c. I can only have listening session during week ends or sunday for 2~5 hours a day. Want to burn in the new cap and tube quicker instead of waiting for months to explore the full potential of the new cap and tube. Never run the paramount more that 6 hours continuously and the power transformer seems to be a little bit hot. Just curious to ask if the Paramount can be operated on 24hrs round the clock basis without damaging the transformer and the cathod resistors (this part is very hot!).
I configured the paramount in 2A3 direct coupling configuration.
Thanks
Andy
I Just upgraded the parafeed copling cap and replaced my old Sovtek 2A3 by Shuguang 2A3c. I can only have listening session during week ends or sunday for 2~5 hours a day. Want to burn in the new cap and tube quicker instead of waiting for months to explore the full potential of the new cap and tube. Never run the paramount more that 6 hours continuously and the power transformer seems to be a little bit hot. Just curious to ask if the Paramount can be operated on 24hrs round the clock basis without damaging the transformer and the cathod resistors (this part is very hot!).
I configured the paramount in 2A3 direct coupling configuration.
Thanks
Andy